服务流程

Service Process

                                 设计服务流程简介图

                                           ↓↓↓↓


▶01

服务方式选择

Service mode selection


纯设计

设计、软装搭配


设计 + 施工

设计、施工、软装搭配


全案托管

设计、施工、主材、软装、设备

→拎包入住


Pure design

Design . Elegant furnished


Design + Construction

Design . Construction . Elegant furnished


The whole package 

Design . Construction . Main materials . Elegant furnished . Equipment 

→to move in


▶02

沟通阶段

Communication stage


步骤一:初步洽谈

              线上 | 线下见面沟通


步骤二:初步意向沟通

              设计师与客户深入沟通 | 确认合作意向 


步骤三:设计合同签约

              支付设计定金 | 制定设计周期及最终交稿时间 | 组建项目设计沟通群


Step 1:Preliminary negotiation

               online | face-to-face communication


Step 2:Preliminary intention communication

               in-depth communication between designer and client | Confirm cooperation intention and arrange measurement


Step 3:Design contract signing

               payment of design deposit | confirm project phase andthe final project submission date| establishment of project design communication group


▶03

设计阶段

Design phase


步骤一:预约量房

              实地勘查 | 拍照录视频留档 | 甲方提供原始建筑平面结构图


步骤二:设计概念

              平面方案设计 | 动线分析图 | 风格意向图


步骤三:方案深化设计

              整体空间效果图


步骤四:施工图纸深化

              原始结构图 | 墙体改造图 | 平面布置图地面铺装图 | 天花布置图 | 灯具定位图开关点位图 | 插座点位图 | 给水点位图立面索引图 | 主要立面图 | 节点大样图


Step 1:Appointment for room measurement

              on-site investigation | Photo and video recordingParty A provides the original building plan and structure diagram


Step 2:Design Concept

               Plane Scheme Design | Flow Line Analysis Diagram | Style Intent Diagram


Step 3:scheme deepening design

               overall spatial rendering


Step 4:Construction drawing deepening

               original structural diagram | wall renovation diagram | floor layout diagramceiling layout diagram | lamp positioning diagram switch point diagram | socket point diagramwater supply point diagram elevation index diagram | main elevation diagram | node detail diagram



▶04

施工落地阶段

Construction landing stage


步骤一:施工合同签约
              根据定稿方案确定施工报价 | 主材费用明细


步骤二:开工交底
              设计师图纸交、接项目负责人、设备、主材供货商进行现场施工交底确保落地可能性


步骤三:施工跟进
              每个重要施工节点前往现场交底,如土建 | 拆除 | 水电 | 木制作 | 泥瓦 | 涂料油漆

            (Tips:异地项目另议对接方式)


步骤四:竣工验收

              根据施工验收标准按节点检查工程质量并及时解决相关问题、签订工程质保单


步骤五:软装深化

              设计师协助客户购买软装,线下提供购买方式或品牌线上提供链接,家具、软装到场后辅助陈列


Step 1:Signing of Construction Contract

               Determine the construction quotation | Detailed breakdown of main material costs


Step 2:Construction briefing
               Handover of designer drawingson-site construction briefing


Step 3:Construction follow-up

               on-site briefing at each important construction nodecivil engineering | demolition | water and electricity | wooden production| mud tiles | coating and painting(Tips: Different docking methods for remote projects to be discussed separately)


Step 4:Completion acceptance

               construction supervisor accompanied and the construction quality assurance form signed


Step 5:Soft Decoration Deepening

               Designers assist clients in purchasing soft furnishings and provide offline purchasing methods or brandsProvide links online to assist in displaying furniture and soft furnishings upon arrival







版权所有 ©  2025 一道设计  粤ICP备2024328461号